We will register people an a first come first serve basis using the postmark date of your application. Please mail in your application to take this exam instead of coming to the office in person. There will be more testing in the spring. There will be more testing in the spring.ĭesigners: October 17th and October 20th - Notice: The Fall 2023 Designers exam is full. Notice: The Fall 2023 Installers exam is full. Installers: October 24th and October 26th. Notice: The Fall 2023 exam dates are listed below. Please also review the Installer or Designer certification schedules depending on which exam you intend on taking. NHDES administers examinations two times per year, with the major testing taking place in the spring and fall. To apply to become a permitted designer or installer, you must complete an application and pass an examination. NHDES will issue a permit to any person who demonstrates a sound working knowledge of the procedures and practices required in site evaluation and the ability to read approved waste disposal plans. Additionally, applications for repair or replacement of an existing septic system must be submitted and installed by a permit-holder. All test pit data must be logged by or under the supervision of a permitted designer. Sewage disposal systems, or septic systems, must be designed and installed by an individual holding a valid permit issued by the NHDES Subsurface Systems Bureau. Conservation, Mitigation, and RestorationĪ wastewater disposal system is required for any structure to which a water supply is connected.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |